Page 35 - Thetha Issue 6
P. 35

INFRASTRUCTURE










































                                                                                            The project brief called
                                                                                            for the creation of a new
                                                                                            entrance building and
                                                                                            visual identity for the
                                                                                            Ocean Sciences Campus,
                                                                                            while also providing
                                                                                            different spaces within
                                                                                            the specialised research
                                                                                            environment. Images:
                                                                                            SVA International

                                              the hyperbaric chamber, research   three-storey vertical green wall.
                                              equipment storage, and equipment   Elana Storm from the University’s
                                              maintenance.                      horticulture department is assisting
                                                 A commons and conference area,   with indigenous plants to populate
                                              comprising a 100-seater seminar   the wall, which will have low water
            be transformed into contemporary   room, three smaller boardrooms and   requirements.
            architecture, and serve their     a coffee shop area, were completed   A three-dimensional sun-screen
            purpose on an appealing, multi-   in B block at the beginning of    layer further defining the main
            use transdisciplinary postgraduate   this year.                     building façade was designed by the
            campus,” says Gouws.                 The E and C block extensions and   OSC architects, SVA International.
               All tenders are done according to   renovations are currently underway   “The system reduces heat gain
            a supply chain management process   and are scheduled to be completed   and  gives visual identity to the
            and contracts have a 30% value    by the end of July this year. The   campus,” says SVA International’s
            allocated to local SMMEs.         work includes multipurpose spaces   Tony Danev, who graduated
               Work started in 2016 with      utilised by postgraduates and visiting   cum laude from Nelson Mandela
            the construction of the gateway   academics, labs, research offices, hot   University with a Master’s in
            entrance and the reconfiguration of   offices, boardroom spaces, and an   Architecture in 2007.
            A block. E and H blocks were then   8-metre-deep diver training tank.   The sun-screen layer also
            modified and modernised to house                                    provides a unique aesthetic inside
            postgraduate labs, offices, a growth   It’s all in the details      the buildings, with ever-changing
            chamber, technical workshops      There are connecting bridges      shadow patterns throughout the day,
            and a large open-plan area for    between E and C, flanked by a     creating an animated internal space.


                                                                                          2022 | mandela.ac.za | 35
   30   31   32   33   34   35   36   37   38   39   40